The static rules judge a manifest on its own terms. Live checks judge it against reality: they fetch what the cluster has actually been doing and compare the proposed change to it.

This is the class of finding that no amount of YAML review catches, because the manifest is internally consistent — it is only wrong for this workload, in this cluster.

Check The question
Limit cut vs usage You are lowering a limit. Is it below what this workload actually uses?
HPA capacity vs demand Can the new max replicas meet the demand this workload has actually seen?
Network policy vs observed edges Would this policy sever a call path that is genuinely in use?
Node selector vs matching nodes Do any nodes actually match the selector you are narrowing to?
Replica drain vs load Can the remaining replicas carry observed load during a drain?
Startup vs observed boot Is the startup probe budget shorter than this workload’s real boot time?
Probe timeout vs latency Is the probe timeout below observed endpoint latency?
Shutdown grace vs observed Is the grace period shorter than this workload takes to shut down?
Grace period vs in-flight Would termination cut off requests still in flight?
PDB blocks drain Does the disruption budget leave a zero eviction budget?
Topology concentration Would this land the workload on a single node?
Config reference vs inventory Do the ConfigMaps and Secrets this manifest references actually exist?

Live checks call the control plane, so they need:

Terminal window
EAC_API_URL # control plane base URL
EAC_API_TOKEN # API token
EAC_ORG_ID
EAC_CLUSTER_ID # which cluster's observed behaviour to compare against
EAC_PROJECT_ID

Without them the gate still runs — it just runs the static rules only. It does not fail because it could not reach the control plane.

Every live check follows the same environment-variable contract, and the middle setting is the one that makes adoption safe:

Variable Effect
DEPLOYMENT_RISK_<CHECK>_ENABLED Turn the check on at all.
DEPLOYMENT_RISK_<CHECK>_GATE_FAILING Whether it can fail the gate, or only warn.
DEPLOYMENT_RISK_<CHECK>_MARGIN Safety margin before it fires.
DEPLOYMENT_RISK_<CHECK>_WINDOW_HOURS How far back the observation window reaches.
DEPLOYMENT_RISK_<CHECK>_TIMEOUT_SECONDS How long to wait for the data.

So the sane rollout is:

  1. Off — the default for most checks.
  2. Enabled, not gate-failing — the finding appears in the PR comment, the build stays green. Run here until you trust the signal on your own traffic.
  3. Enabled and gate-failing — now it blocks merges.

Some checks take additional bounds — MIN_CALLS on the network-policy edge check, MIN_STARTS on the startup-boot check — so a conclusion is never drawn from one or two observations.

Each live check has its own timeout. If the control plane is slow or unreachable, that check is skipped and the gate proceeds on what it has. A CI gate that blocks every merge because a telemetry query timed out would be removed from the pipeline within a week — so it does not do that.

The trade-off is explicit: a skipped live check is not a passed live check, and the report says which ones did not run.